Call us on 01282 863825
A devastating fire resulted in total destruction to the entire building of multinational fast food company McDonald’s, Preston.
Askews was commissioned to remove and replace all fire damaged air-conditioning units, ventilation ductwork, the kitchen extract systems and all sanitary and kitchenware from the roof down to the basement.
The emergency project was carried out quickly and efficiently.
All work was completed to the highest standard in less than fours weeks from the date of the fire to when the new store served its first breakfast.
Work included:
– A state-of-the-art electric air conditioning system with Nordair Niche Air Handlers.
– A Mitsubishi electric unit incorporating gas heaters.
– New kitchen and toilet extraction systems.
– Installation of toilet sanitary ware, including an Ecoprod waterless urinal, which saves 10,000 litres of water a year.
– Mitsubishi electric heat pumps and above door heaters.
– A Trend Control System, which automatically turns all systems on and off at set times.
– Removal of all damaged systems using crane lifts.